Customization: | Available |
---|---|
After-sales Service: | Support Overseas Installation and Training. |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Automatic Labeling Machine
1. Servo or German original imported labeling engine can be selected to meet the needs of different customers
2. For single machine operation, feeding and receiving turntables can be selected to maximize production efficiency
3. The overall material of the equipment is international standard S304 stainless steel and imported aluminum alloy material, double anodic oxidation treatment, never rust and deformation
4. The transparent label does not bubble, and the sticker label does not wrinkle
5. Bottle splitting mechanism adopts large silica gel wheel for bottle splitting, so that the bottles can enter into the label place equidistant, stable and accurate
6. The detachable plastic belt or industrial synchronous belt is selected for the coil marking mechanism to make the label more firmly attached
Widely used in cosmetics, food, medicine, disinfection water and other industries. Optional circumferential positioning detection device, can achieve the designated position in the circumferential surface labeling
Model | MT-200 |
Labeling precision | ±1mm (depending on the bottle degree, perpendicular round) |
Poster speed | 25-60pcs/min(related to product size) |
Bottle diameter | Ø20mm-Ø90mm;(can be customized according to product size) |
Label size | L:20mm-300mm W:20mm-170mm |
Machine size | About 1950mm*1200mm*1530mm |
Voltage | 220V/50HZ; |
Machine weight | About 200Kg |
Applicable label inner diameter | Ø76mm |
Applicable label outer diameter | Ø300mm |
1. About Delivery term
Q: What's the delivery term for doing business with you?
A: EXW/FOB/CIF/DDU… it depends on preference of clients.
2. About Lead time
Q: What's the leading time after placing order?
A: After getting your confirmation, mixing tank about 25 days, pump 15 days, colloid mill 10 days. However, it depends on production schedule is in slack or peak season, and the complication of machines.
3. About Payment time
Q: What's the payment term?
A: T/T 40% as down payment, 60% balance payment before delivery.
4. About Quality
Q: How do you control your quality?
A: All machines before delivery will be tested and send video for customer, if no problem then arrange balance payment. Meanwhile,CE is available for customers' needs.
5. About Packing
Q: How do you pack the machines?
A: Standard export wooden case, to avoid damage during delivery.
6. About Customized
Q: Can you produce according to the samples?
A: Yes,we can produce by your samples or technical drawings.